FFDJ Construction of 20 Studio Apartments (R+2) (2021-2023) - French Army-Base Navale/Heron/Djibouti (2022-2023)


The Project is located in a French military compound called "SITE DU HERON", right of way of the "Djibouti NAVAL BASE".the purpose of project is to realize a new building of housing, in R+2, composed of 20 studios of 22.25 m² each, for the accommodation of the personnel of the French armies in single . Common rooms (luggage rooms, technical rooms, vehicle parking space, bicycle room, motorcycle space, etc.) will also be built in the building, as well as metal shelters for parking vehicles on the peripheral roads created. The contract includes the works General cleaning of the current area, clearing, felling and stump removal of trees, demolition of current HS networks located on the right-of-way of the site and various outdoor facilities, etc. Earthworks of structures: BCC building, VL shelters, peripheral roads, etc. Construction of a new building in heavy structure "formed concrete" and "concrete posts-beams", of 1500 m² , Exterior reinforced concrete stairwell (walls, flights, landings), Peripheral VRD: roads, networks, “disposal bag” space, drying racks, outdoor uncovered car parks, peripheral fence, Exterior and Interior lighting, Realization of "open" metal shelters for vehicles, Asphalt Parking Area, Road Painting and Marking, New Sewage System with Manholes, New Potable Water System with manholes and valves, New High and Low current cable lines with manholes, Installation of Lighting Poles around parking area, Roof heat and water insulation, New Steel Roof structure with sandwich panels. Exterior Wall, Roof and Ground Floor Ceiling Heat Insulation, PVC mineral cladding for exterior walls, Epoxy paint cover for Ground Floor, New A/C System for each room.